Photovoltaic system Zernitz-LohmZernitz-Lohm, Germany

Free-field PV system with 6.3 MWp

Performance by PohlCon Solar: material supply and installation
Substructure: Frame types 3x28P and 3x14P, 2-support systems (portrait)

Construction Period
January 2022 – March 2022

Contact us.

Just give us a call or write to us - we look forward to it!